Drilled and Primed Bulkheads

Today I spent a couple of hours drilling and dimpling the aft bulkheads, and then a couple more hours priming several parts.

I used the drill block to match drill several holes from one of the bulkheads into the Vertical Stabilizer, the block was a huge help to ensure these were perpendicular to the bulkhead web. I was happy with how they turned out. Three of the holes will get final drilled to #12 and will take bolts that hold the vertical stabilizer to the fuselage. Any error in the hole orientation will effect the aerodynamics of the VS.

I needed to dimple the flanges of two bulkheads, but due to the angle of the flange, there is no way to get a female die on the inboard side of the flange. I have a spare squeezer yoke, so I cut off the end with a hacksaw, then ground it down to a small cross section. With the modified yoke, I was able to squeeze the dimples.

Modified yoke for dimpling angles flanges
Modified yoke clears the bulkhead web and the female die sits flush with the inside of the flange

In the evening I primed several parts for the aft bulkheads. The new hi-flow connectors made a significant difference. I used less paint, and the finish was much better. The paint atomized into much finer particles, covering the parts more evenly. The compressor was working harder, and I had to wait for it to catch up a few times.

About to start priming the aft bulkheads

It’s hard to tell from the photos, but the finish is significantly improved.

Primed bulkhead. The finish is much improved with the hi-flow connectors