Last night, and again tonight I spent time deburring the top side skins. I finished deburring these skins, and these are now ready to be primed. My goal is to prime them this weekend, so they are ready to go when I need them in the near future.
At this point I have a number of tasks to complete. I need to fix my cracked dimples, finish up my wiring runs (install a couple of zip ties), install the aft deck, then install the top skins, finishing the aft fuse. Then I need to start working through the QB sections, checking that all steps were completed.
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2020/06/img_5859.jpg?resize=648%2C435&ssl=1)