![](https://i0.wp.com/mytwings.com/wp-content/uploads/2020/07/img_6141.jpg?resize=648%2C592&ssl=1)
Last week my drill block parts arrived, so today I made the block. I cut about 3 inches off the foot long section of aluminum bar. Then I spent time squaring up my drill press, which meant fiddling with the table to get it sitting perfectly square. It had been about 2 degrees off level, it turned out. With the table square, I drilled two holes and inserted two of the sleeves that correspond to the holes a I need in the aft bulkhead. The holes came out pretty square, this should be great for helping keep the holes straight.
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2020/07/img_6139.jpg?resize=648%2C459&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2020/07/img_6140.jpg?resize=602%2C1024&ssl=1)
Finished product. On the other side is a channel for redirecting shavings from the drill.