Today I spent some time tidying up and securing the wiring runs in the wings. This was mostly a case of installing zip ties and de-slacking the runs. I also installed some heat shrink to each of the molex connectors and installed some spiral wrap in areas where there’s a possibility of rubbing on bolts on the wing spar, or screws from inspection plates etc.

