Bulkhead test-fit

Today I dimpled, drilled, and test fit the baggage compartment aft wall bulkhead. Dimpling was tricky in places due to the flange shapes, but I managed with my hand squeezer and narrow dimple dies. I step drilled a systems hole, and then started test fitting the bulkhead. I’ll need to flute the flanges, but ran out of time tonight to finish.

Dimpling the bulkhead flanges
Checking the left side of the bulkhead for fit. Some fluting will be needed