Today I dimpled, drilled, and test fit the baggage compartment aft wall bulkhead. Dimpling was tricky in places due to the flange shapes, but I managed with my hand squeezer and narrow dimple dies. I step drilled a systems hole, and then started test fitting the bulkhead. I’ll need to flute the flanges, but ran out of time tonight to finish.
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2021/03/img_8519-1.jpg?resize=648%2C525&ssl=1)