Baggage floor riveting

Tonight I started riveting the baggage floor. I started on the left side of the fuselage, and set all of the pull rivets, except for those oblong the outside edge. For the edge, I think it will be easier to roll the fuselage onto the other side, so that gravity helps keep the squeezer correctly oriented.

It’s so easy doing pop rivets with the pneumatic squeezer, and I was able to cover a lot of ground in just an hour or so. It’s also quiet, and I was able to work on this late at night without keeping anyone awake.

The area where I started riveting. The blue tape is to remind me to not rivet those holes yet
Where I left the session. I think I got all the pop rivets on the left side, except those along the outside edge.
Pop riveting

2 thoughts on “Baggage floor riveting

  1. Well done Neal, good to see you making progress
    Easy to see why the pop riveted planes are popular

Comments are closed.