Baggage floor

Today I finished the baggage floor, and installed the splice. Then I installed nutplates on the flap motor bracket, which is now ready to install. Everything went well, except the final rivets between the floors and the side ribs. These holes were not well aligned, and I needed to ream them somewhat to get rivets into the holes.

Fuselage on rotisserie makes this work much easier
Floors finished, and splice installed
Nutplates installed