Yesterday I was able to install the flap motor channel and flap motor brackets, and today I installed the baggage compartment side walls. Actually, I didn’t quite finish; there are some rivets I will need to buck tomorrow to wrap up. It is too late in the evening to start riveting.

The pop riveting is so fast, it’s really amazing how quickly and easily it all comes together. I wouldn’t attempt this without a pneumatic squeezer though, it would be painful to manually set these hundreds of rivets. I made extensive use of the “wedge tool”. I found it very useful to have a piece of tape on the little wedge so I could tape it into the correct orientation before setting the rivet.

Flap motor channel installed. 4 rivets at the bottom need to be bucked
Motor mounts riveted into position
Baggage side walls clecoed into place
Riveting the side panels into place
Where it stands at the end of the day. Clecos on the left indicate rivets that need bucking. Note the clecos on the right at the bottom of the flap motor channel, also need bucking