Pushrods

Tonight I started making up the elevator pushrods. There are three aluminum tubes that have caps installed, with threads for rod end bearings. I final drilled the holes in all three pushrods and primed the inside of the tubes.

The plans ship with a template, which I used to trace onto some thin trace paper. I’m glad I traced it, vs just cutting it out of the page in the plans, because I discovered the printing wasn’t to scale. The first template I made didn’t quite fit around, and when I checked the scale on the plans page I realized it was printed at about 95% true size.

Once I had adjusted for the error and made a new template I marked out the holes and drilled them using my pipe clamp.

Then with the end caps in place, I final drilled all the holes and deburred them. Then i primed the insides of the tubes and left them to dry overnight.

Pilot holes drilled in one end of one pushrod
Drilling the holes. Lots of them.
Clecos holding the end caps as I work around match-drilling the final size holes
Another shot of the ends being final drilled