Tonight I installed the baggage floors, final sized some nutplate holes, and then clecoed the floors to the substructure. before I started, I spent time carefully cleaning out the under-floor area. Using a damp cloth I wiped all the surfaces, then vacuumed everything with a brush-head fitting.
The next step is to rivet these floors down using a variety of rivets. I’ll be making good use of the pneumatic pulled-rivet squeezer, along with my hand squeezer, and rivet gun.
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/08/img_2501.jpg?resize=648%2C475&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/08/img_2502.jpg?resize=648%2C542&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/08/img_2503.jpg?resize=648%2C466&ssl=1)