More progress on the baggage floor riveting tonight. I worked mostly on the right side floor, getting it almost to the same point as the left side. This has been a relatively easy riveting job so far, although I’m saving the harder rivets until the end. Hopefully I can wrap up this step over the next couple of days.
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/08/img_2534.jpg?resize=648%2C534&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/08/img_2535.jpg?resize=648%2C866&ssl=1)