Tonight I finished the rudder pedals, final-sizing the holes and riveting the parts together. I was able to squeeze all of the rivets, so assembly was easy. It’s recommended to put the shop head of a rivet on the side with the thickest material, but I didn’t like the idea of having the shop heads visible on the pedals, so I deviated from that.
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/09/img_2689.jpg?resize=648%2C582&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/09/img_2690.jpg?resize=648%2C487&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/09/img_2691.jpg?resize=648%2C696&ssl=1)
![](https://i0.wp.com/mytwings.com/wp-content/uploads/2022/09/img_2692.jpg?resize=648%2C652&ssl=1)