![](https://i0.wp.com/mytwings.com/wp-content/uploads/2019/07/IMG_2876-e1562298709531-1024x768.jpg?resize=648%2C486&ssl=1)
Today I started on the Toolbox Practice Kit. The first steps are to prep (match drill, debur, dimple) and rivet the sides to the body of the box. I wasn’t able to squeeze every rivet, so I ended up bucking a few along the bottom edge. This is progressing much faster than the previous practice kit.